HWY WASHNGTON ST over ST 3

WASH.ST AT ST 3 · County 021, Massachusetts · Built 1957 · 6 Lanes · 27,931 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B2102736EDOTNBI
Year Built
1957
Reconstructed
1977
Length
56.4 m (185 ft)
Max Span
27.1 m
Width
13.4 m (44 ft)
Lanes
6
Daily Traffic
27,931
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,959,000
Total Project Cost
$7,439,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.