HWY ELM ST over ST 3
.64 KM.NE OF UNION ST · County 021, Massachusetts · Built 1957 · 2 Lanes · 13,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.221792, -71.002117
This bridge is in worse condition than 64.4% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
HWY ELM ST over COMB MBTA & RED SSH
Built 1957
HWY ELM ST over HWY OLD ELM ST
Built 1957
ST 3 over COMB MBTA/CSX & REDS
Built 1957
HWY RIVER ST over WATER MONATIQUOT RIVER
Built 1978
HWY WASHNGTON ST over ST 3
Built 1957
HWY MIDDLE ST over WATER MONATIQUOT RIVER
Built 1955
HWY MIDDLE ST over RR MBTA
Built 1955
HWY WASHNGTON ST over RR MBTA
Built 1957
HWY RAMP F over RR MBTA
Built 1977
HWY ADAMS ST over WATER MONATIQUOT RIVER
Built 1886
Bridge Details
- Structure #
- B2102636LDOTNBI
- Year Built
- 1957
- Length
- 54 m (177.2 ft)
- Max Span
- 25.3 m
- Width
- 16.6 m (54.5 ft)
- Lanes
- 2
- Daily Traffic
- 13,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,928,000
- Total Project Cost
- $8,893,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.