HWY ADAMS ST over WATER MONATIQUOT RIVER
JUST S OF ELM BY MOBIL · County 021, Massachusetts · Built 1886 · 2 Lanes · 6,200 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.224689, -70.995319
This bridge is in worse condition than 7.6% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 140 years old.
Nearby Bridges
HWY MIDDLE ST over WATER MONATIQUOT RIVER
Built 1955
HWY ADAMS ST over WATER MONATIQUOT RIVER
Built 1971
HWY MIDDLE ST over RR MBTA
Built 1955
HWY ELM ST over HWY OLD ELM ST
Built 1957
HWY RIVER ST over WATER MONATIQUOT RIVER
Built 1978
HWY ELM ST over COMB MBTA & RED SSH
Built 1957
HWY ELM ST over ST 3
Built 1957
ST 3 over COMB MBTA/CSX & REDS
Built 1957
HWY WASHNGTON ST over ST 3
Built 1957
HWY WASHNGTON ST over RR MBTA
Built 1957
Bridge Details
- Structure #
- B2100533AMUNNBI
- Year Built
- 1886
- Reconstructed
- 1998
- Length
- 11.8 m (38.7 ft)
- Max Span
- 10.1 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 6,200
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $674,000
- Total Project Cost
- $1,012,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.