HWY SUMMER ST over ST 3 PILGRIM HWY
1 MI W OF RTE 3A · County 023, Massachusetts · Built 1951 · 2 Lanes · 8,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.949847, -70.678975
This bridge is in worse condition than 10.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 75 years old.
Nearby Bridges
ST 3 SB/PLGRM HWY over US 44 SAMOSET ST
Built 1992
ST 3 NB/PLGRM HWY over US 44 SAMOSET ST
Built 1992
ST 3 NB/PLGRM HWY over HWY BILLINGTON ST
Built 1950
ST 3 SB/PLGRM HWY over HWY BILLINGTON ST
Built 1950
HWY NEWFIELD ST over WATER TOWN BROOK
Built 2019
HWY MARKET ST over WATER TOWN BROOK
Built 1964
ST 3 A/MAIN ST over WATER TOWN BROOK
Built 1908
US 44 EB (CON D) over ST 3 PILGRIM HWY
Built 2003
US 44 EB over HWY INDUSTRIAL PARK RD
Built 2003
US 44 WB (CON A) over ST 3 PILGRIM HWY
Built 2003
Bridge Details
- Structure #
- P130234B2DOTNBI
- Year Built
- 1951
- Length
- 33.2 m (108.9 ft)
- Max Span
- 14.9 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 8,600
- Material
- Concrete Continuous
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,561,000
- Total Project Cost
- $3,842,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.