ST 3 A/MAIN ST over WATER TOWN BROOK

.5 M S OF RTE 44 · County 023, Massachusetts · Built 1908 · 2 Lanes · 8,357 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
P1300146WDOTNBI
Year Built
1908
Reconstructed
1919
Length
13.5 m (44.3 ft)
Max Span
13 m
Width
18.6 m (61 ft)
Lanes
2
Daily Traffic
8,357
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,691,000
Total Project Cost
$2,537,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.