ST 3 NB/PLGRM HWY over HWY BILLINGTON ST

2.5 M S OF KINGSTON TL · County 023, Massachusetts · Built 1950 · 2 Lanes · 46,785 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P1302649ADOTNBI
Year Built
1950
Reconstructed
1978
Length
19.2 m (63 ft)
Max Span
16.2 m
Width
30.2 m (99.1 ft)
Lanes
2
Daily Traffic
46,785
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,922,000
Total Project Cost
$5,884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.