HWY S MERRIAM ST over RR CSX

0.1 MI N OF US 20 151.06 · County 003, Massachusetts · Built 1992 · 2 Lanes · 6,827 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P100170DRDOT634
Year Built
1992
Length
17.9 m (58.7 ft)
Max Span
17 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
6,827
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,010,000
Total Project Cost
$1,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.