US 20 /US7/SOUTH over WATER HOUSATONIC RIVER

@ FAIRFIELD ST · County 003, Massachusetts · Built 1900 · 2 Lanes · 23,286 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
P100320B0DOTNBI
Year Built
1900
Reconstructed
1937
Length
20.4 m (66.9 ft)
Max Span
19.3 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
23,286
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,209,000
Total Project Cost
$3,314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.