HWY MAIN ST over WATER WARE RIVER

350 W OF CHURCH ST · County 013, Massachusetts · Built 1937 · 2 Lanes · 4,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
P0101517AMUNNBI
Year Built
1937
Length
33.5 m (109.9 ft)
Max Span
12.8 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
4,300
Material
Concrete Continuous
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,627,000
Total Project Cost
$3,941,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.