HWY STATE ST over WATER WARE RIVER

200 E OF EMERY ST · County 013, Massachusetts · Built 2011 · 2 Lanes · 4,397 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
P01018B5EMUNNBI
Year Built
2011
Length
33.6 m (110.2 ft)
Max Span
16.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
4,397
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,914,000
Total Project Cost
$4,372,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.