ST181 DEPOT ST over WATER SWIFT RIVER

AT PALMER T.L.& SWIFT RV · County 015, Massachusetts · Built 1937 · 2 Lanes · 5,689 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B05001127DOTNBI
Year Built
1937
Reconstructed
1994
Length
34.9 m (114.5 ft)
Max Span
13.1 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
5,689
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,023,000
Total Project Cost
$4,535,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.