HWY MCAULEY RD over WATER HUDSON BROOK

0.1 MI N OF ROUTE 8 · County 003, Massachusetts · Built 2003 · 1 Lanes · 120 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
N14020AX2MUNNBI
Year Built
2003
Length
14.6 m (47.9 ft)
Max Span
14 m
Width
5.2 m (17.1 ft)
Lanes
1
Daily Traffic
120
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,210,000
Total Project Cost
$3,316,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.