I 90 WB RAMP OFF over RR MBTA

AT INT 16 S15 · County 017, Massachusetts · Built 1964 · 2 Lanes · 8,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
N120684QUDOTNBI
Year Built
1964
Reconstructed
1995
Length
17.1 m (56.1 ft)
Max Span
14.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
8,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,496,000
Total Project Cost
$2,245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.