I 90 WB RAMP OFF over RR MBTA
AT INT 16 S15 · County 017, Massachusetts · Built 1964 · 2 Lanes · 8,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
42.347456, -71.235233
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 62 years old.
Nearby Bridges
I 90 WB RAMP OFF over HWY ACCESS RD
Built 1964
ST 16 WB/WSHGTN ST over COMB I 90 & CSX/MBTA
Built 1964
ST 16 EB/WSHGTN ST over COMB I 90 & CSX/MBTA
Built 1964
ST 30 WB SERVCE RD over COMB I 90 & CSX/MBTA
Built 1964
ST 30 COMM AVE over COMB I 90 & CSX/MBTA
Built 1964
HWY HIGHLAND ST over COMB I 90 & CSX/MBTA
Built 1964
HWY CHESTNUT ST over COMB I 90 & CSX/MBTA
Built 1964
HWY AUBURN ST over COMB I 90 & CSX/MBTA
Built 1964
HWY WOODLAND RD over COMB I 90 & CSX/MBTA
Built 1964
I 90 over RR CSX/MBTA
Built 1965
Bridge Details
- Structure #
- N120684QUDOTNBI
- Year Built
- 1964
- Reconstructed
- 1995
- Length
- 17.1 m (56.1 ft)
- Max Span
- 14.9 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 8,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,496,000
- Total Project Cost
- $2,245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.