ST 16 EB/WSHGTN ST over COMB I 90 & CSX/MBTA

AT INT 16 S17 · County 017, Massachusetts · Built 1964 · 2 Lanes · 17,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
N120154QXDOTNBI
Year Built
1964
Reconstructed
1996
Length
64 m (210 ft)
Max Span
16.8 m
Width
20.2 m (66.3 ft)
Lanes
2
Daily Traffic
17,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,524,000
Total Project Cost
$12,787,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.