HWY CHESTNUT ST over COMB I 90 & CSX/MBTA

.8 KM W. ARMORY S19 · County 017, Massachusetts · Built 1964 · 2 Lanes · 7,241 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
N120254R0DOTNBI
Year Built
1964
Reconstructed
1994
Length
47.5 m (155.8 ft)
Max Span
18.5 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
7,241
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,955,000
Total Project Cost
$7,433,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.