I 90 over RR CSX/MBTA

.2 MI E.CHARLES RV S11 · County 017, Massachusetts · Built 1965 · 6 Lanes · 106,825 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N120674QNDOTNBI
Year Built
1965
Length
35.4 m (116.1 ft)
Max Span
29 m
Width
27.7 m (90.9 ft)
Lanes
6
Daily Traffic
106,825
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,474,000
Total Project Cost
$9,712,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.