I 90 over COMB I 95 & CHARLES RIV

OVER ST 128 CHARLES RV S9 · County 017, Massachusetts · Built 1964 · 6 Lanes · 119,166 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
N120664QKDOTNBI
Year Built
1964
Length
316.1 m (1037.1 ft)
Max Span
46.9 m
Width
28 m (91.9 ft)
Lanes
6
Daily Traffic
119,166
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$57,623,000
Total Project Cost
$86,435,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.