ST 30 SOUTH AVE over I 95 /ST128

RT 30 AT RT 128 · County 017, Massachusetts · Built 1962 · 4 Lanes · 32,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W290152K0DOTNBI
Year Built
1962
Length
82.3 m (270 ft)
Max Span
25.9 m
Width
26.5 m (86.9 ft)
Lanes
4
Daily Traffic
32,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,280,000
Total Project Cost
$21,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.