I 90 EB OFF RAMP over OTHER MDC AQUEDUCT

ON MASS PIKE OFF RAMP · County 017, Massachusetts · Built 1961 · 2 Lanes · 31,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W290322MADOTNBI
Year Built
1961
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
41.5 m (136.2 ft)
Lanes
2
Daily Traffic
31,700
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,425,000
Total Project Cost
$3,638,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.