I 95 /ST128 over OTHER MDC AQUEDUCT
0.1 MI NLY RT 30 · County 017, Massachusetts · Built 1950 · 8 Lanes · 150,095 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.344953, -71.262672
This bridge is in worse condition than 25.6% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 76 years old.
Nearby Bridges
I 95 ON RAMP over OTHER MDC AQUEDUCT
Built 1950
I 90 RMP D INT 14 over OTHER MDC PIPE@NRMBGA RD
Built 1956
ST 30 SOUTH AVE over I 95 /ST128
Built 1962
US 90 RAMP D over HWY NORUMBEGA RD
Built 1957
I 95 /ST128 over HWY NORUMBEGA RD
Built 1950
ST 30 COMM AVE over WATER CHARLES RIVER
Built 1962
I 90 RAMP D over ST 30 SOUTH AV& I95 RMPS
Built 1957
I 90 RAMPS over COMB I 95 & CHARLES RIV
Built 1957
I 90 RAMPS A & B over OTHER MWRA AQUEDUCT
Built 1957
I 90 EB OFF RAMP over OTHER MDC AQUEDUCT
Built 1961
Bridge Details
- Structure #
- W290242F3DOTNBI
- Year Built
- 1950
- Reconstructed
- 1962
- Length
- 12.5 m (41 ft)
- Max Span
- 11 m
- Width
- 47.5 m (155.8 ft)
- Lanes
- 8
- Daily Traffic
- 150,095
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $802,000
- Total Project Cost
- $1,204,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.