HWY FIFTH ST over WATER UTILITY CANAL

100 E CONN RIVER · County 011, Massachusetts · Built 1954 · 2 Lanes · 10,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
M2801512TDOTNBI
Year Built
1954
Reconstructed
1992
Length
41.2 m (135.2 ft)
Max Span
40.7 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
10,000
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,269,000
Total Project Cost
$9,404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.