HWY TRNRS FLS RD over WATER CONNECTICUT RIVER

235 NW OF CANAL ST · County 011, Massachusetts · Built 1936 · 2 Lanes · 7,136 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
G1200212RDOTNBI
Year Built
1936
Length
136.7 m (448.5 ft)
Max Span
22.9 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
7,136
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,294,000
Total Project Cost
$10,942,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.