ST 2 over WATER FALL RIVER

MM 52.7 ON ST 2 · County 011, Massachusetts · Built 1931 · 2 Lanes · 28,448 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
G040030UFDOTNBI
Year Built
1931
Reconstructed
2015
Length
68.6 m (225.1 ft)
Max Span
22.6 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
28,448
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$861,000
Total Project Cost
$1,292,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.