HWY AVENUE A over WATER CONN RIV AND CANAL
AT GILL-MONTAGUE T.L. · County 011, Massachusetts · Built 1937 · 2 Lanes · 11,100 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.611367, -72.552225
This bridge is in worse condition than 35% of bridges in County 011. The average bridge in Massachusetts is 0 years old; this one is 89 years old.
Nearby Bridges
ST 2 over WATER FALL RIVER
Built 1931
HWY PROSPECT ST over HWY SPRING ST
Built 2010
HWY FIFTH ST over WATER UTILITY CANAL
Built 1954
HWY TRNRS FLS RD over WATER CONNECTICUT RIVER
Built 1936
HWY SIXTH ST over WATER UTILITY CANAL
Built 1988
HWY ELEVENTH ST over WATER UTILITY CANAL
Built 1915
ST 2 WB over US 5 /ST10/BRNRDSTN RD
Built 1964
ST 2 EB over US 5 /ST10/BRNRDSTN RD
Built 1965
US 5 /ST10/BNDSTN over WATER CHERRY RUM BROOK
Built 1964
ST 2 EB RAMP 5S2E over ST 2 WB RAMP 5S2W
Built 1964
Bridge Details
- Structure #
- G04010133DOTNBI
- Year Built
- 1937
- Length
- 528.2 m (1732.9 ft)
- Max Span
- 137.2 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 11,100
- Material
- Steel
- Design
- Truss - Deck
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $44,646,000
- Total Project Cost
- $66,970,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.