HWY CENTRAL ST over WATER BLACKSTONE RIVER

.1 MI. S. OF ST-122 · County 027, Massachusetts · Built 2006 · 2 Lanes · 14,740 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M24006AXQMUNNBI
Year Built
2006
Length
25.9 m (85 ft)
Max Span
24.4 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
14,740
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,216,000
Total Project Cost
$1,825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.