HWY CENTRAL ST over OTHER BLACKSTONE CANAL

.2 MI SOUTH OF ST 122 · County 027, Massachusetts · Built 2006 · 2 Lanes · 14,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
M24002AXPMUNNBI
Year Built
2006
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
14,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$437,000
Total Project Cost
$656,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.