HWY RIVER RD over WATER WATER BACON BROOK

BTWN 146A&122 NR MILLVILL · County 027, Massachusetts · Built 2011 · 2 Lanes · 1,977 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
U02030BAMMUNNBI
Year Built
2011
Length
15.2 m (49.9 ft)
Max Span
14 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,977
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$923,000
Total Project Cost
$1,385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.