RI 5 (CENTRAL ST) over RI 146 N SMITHFIELD EXP

0.1 MI S OF JCT MASS LINE · County 007, Rhode Island · Built 2017 · 2 Lanes · 2,285 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000004495
Year Built
2017
Length
56.8 m (186.4 ft)
Max Span
15.8 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
2,285
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,707,000
Total Project Cost
$14,838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.