I 495 SB over OTHER BIKE TRAIL

JUST S. OF MM 48.8 · County 027, Massachusetts · Built 1968 · 3 Lanes · 41,829 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
M210171UFDOTNBI
Year Built
1968
Length
23.8 m (78.1 ft)
Max Span
22.3 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
41,829
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,665,000
Total Project Cost
$3,998,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.