HWY HILLSIDE DR over WATER DEER BROOK

0.2 MI S OF MARSHALL ST · County 017, Massachusetts · Built 2000 · 2 Lanes · 100 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H20006CF6MUNNBI
Year Built
2000
Length
7 m (23 ft)
Max Span
7 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$312,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.