I 495 NB over ST109 MEDWAY RD

1 MI. S. OF ST-16 · County 027, Massachusetts · Built 1968 · 3 Lanes · 47,650 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
M210221UDDOTNBI
Year Built
1968
Length
43 m (141.1 ft)
Max Span
20.4 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
47,650
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,885,000
Total Project Cost
$7,328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.