I 495 SB over ST 85 CEDAR ST

1 MI. N. OF ST.16 · County 027, Massachusetts · Built 1967 · 3 Lanes · 52,091 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M210201ULDOTNBI
Year Built
1967
Length
32.9 m (107.9 ft)
Max Span
31.4 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
52,091
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,646,000
Total Project Cost
$2,470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.