HWY RUPERT RD over WATER HUCKLEBERRY BROOK

.2 MI EAST OF HAVEN ST · County 027, Massachusetts · Built 1995 · 2 Lanes · 300 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M21033CGDMUNNBI
Year Built
1995
Length
6.2 m (20.3 ft)
Max Span
6.1 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$245,000
Total Project Cost
$368,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.