HWY SUDBURY ST over WATER MILL CANAL

.2MI.SOUTH OF ST.62 · County 017, Massachusetts · Built 1956 · 2 Lanes · 2,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
M1001024PMUNNBI
Year Built
1956
Length
11.3 m (37.1 ft)
Max Span
10.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,500
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$804,000
Total Project Cost
$1,207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.