ST 62 MAIN ST over WATER ASSABET RIVER

0.25 MI SW RT 27 & MAIN · County 017, Massachusetts · Built 1922 · 2 Lanes · 11,163 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
M1000428TDOTNBI
Year Built
1922
Length
18.9 m (62 ft)
Max Span
8.2 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
11,163
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,301,000
Total Project Cost
$6,452,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.