HWY WALNUT ST over WATER ASSABET RIVER
.1 MI. S. OF ST-62 · County 017, Massachusetts · Built 1922 · 2 Lanes · 2,500 vehicles/day
Overall
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.430958, -71.453653
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 104 years old.
Nearby Bridges
ST 62 MAIN ST over WATER ASSABET RIVER
Built 1922
HWY FLORIDA RD over WATER ASSABET RIVER
Built 2023
ST 27 /ST62/WALTHM over WATER ASSABET RIVER
Built 2013
HWY SUDBURY ST over WATER MILL CANAL
Built 1956
ST117 GREAT RD over WATER MILL CANAL
Built 1850
HWY MILL ST over WATER ASSABET RIVER
Built 1937
ST117 GREAT RD over WATER ASSABET RIVER
Built 1900
HWY WHITE PND RD over WATER ASSABET RIVER
Built 2007
ST 62 PWDR MILL RD over WATER ASSABET RIVER
Built 1953
ST 62 MAIN ST over WATER ASSABET RIVER
Built 1958
Bridge Details
- Structure #
- M1000524NMUNNBI
- Year Built
- 1922
- Length
- 22.3 m (73.2 ft)
- Max Span
- 22.3 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,500
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,762,000
- Total Project Cost
- $2,644,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.