HWY MILL ST over WATER ASSABET RIVER

0.2 MI. N. OF RT. 62 · County 017, Massachusetts · Built 1937 · 2 Lanes · 1,040 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
M1000325UMUNNBI
Year Built
1937
Length
21.3 m (69.9 ft)
Max Span
7 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,040
Material
Steel
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,500,000
Total Project Cost
$2,251,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.