I 290 RAMP H over HWY 85 CONNECTOR

.2 MILES EAST OF 495 · County 017, Massachusetts · Built 1978 · 1 Lanes · 29,749 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
M0601927EDOTNBI
Year Built
1978
Length
26.5 m (86.9 ft)
Max Span
24.6 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
29,749
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,771,000
Total Project Cost
$2,657,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.