I 290 EB over I 495

2 MILES NORTH OF ROUTE 20 · County 017, Massachusetts · Built 1968 · 2 Lanes · 30,965 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
M060161TXDOTNBI
Year Built
1968
Length
82.9 m (272 ft)
Max Span
29.9 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
30,965
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,592,000
Total Project Cost
$14,389,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.