I 495 NB over HWY BERLIN RD

.5 MI. S. OF I-290 · County 017, Massachusetts · Built 1963 · 3 Lanes · 46,783 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
M0601227YDOTNBI
Year Built
1963
Length
44.2 m (145 ft)
Max Span
13.4 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
46,783
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,996,000
Total Project Cost
$7,495,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.