I 290 WB over I 495

2 MILES NORTH OF ROUTE 20 · County 017, Massachusetts · Built 1968 · 2 Lanes · 89,528 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
M060161TYDOTNBI
Year Built
1968
Length
82.9 m (272 ft)
Max Span
29.9 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
89,528
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,538,000
Total Project Cost
$14,308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.