HWY GENOVEVO DR over WATER MINECHOAG BROOK

.3M EAST OF MILLER STREET · County 013, Massachusetts · Built 1991 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L16027BV4MUNNBI
Year Built
1991
Length
10 m (32.8 ft)
Max Span
4.8 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$583,000
Total Project Cost
$875,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.