I 90 EXIT 54 RAMP over I 90

MM 54.8 ON I-90 · County 013, Massachusetts · Built 1957 · 2 Lanes · 14,740 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
L160094JGDOTNBI
Year Built
1957
Reconstructed
1990
Length
79.8 m (261.8 ft)
Max Span
21.3 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
14,740
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,206,000
Total Project Cost
$12,310,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.