I 90 EB over ST 21 CENTER ST

MM 54.3 ON I-90 EB · County 013, Massachusetts · Built 1957 · 2 Lanes · 59,670 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
L160104JHDOTNBI
Year Built
1957
Reconstructed
1995
Length
35.1 m (115.2 ft)
Max Span
16.8 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
59,670
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,179,000
Total Project Cost
$4,769,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.