I 90 EB over HWY EAST ST

MM 56.1 ON I-90 · County 013, Massachusetts · Built 1957 · 2 Lanes · 27,180 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L160234JCDOTNBI
Year Built
1957
Reconstructed
1995
Length
34.1 m (111.9 ft)
Max Span
31.9 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
27,180
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,159,000
Total Project Cost
$4,739,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.