HWY EAST ST over WATER CHICOPEE RIVER

AT WILBRAHAM LINE · County 013, Massachusetts · Built 1937 · 2 Lanes · 5,172 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L160020MAMUNNBI
Year Built
1937
Reconstructed
1985
Length
52 m (170.6 ft)
Max Span
25.3 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
5,172
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,799,000
Total Project Cost
$5,699,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.