HWY THREE RIV RD over I 90

MM 58.9 ON I-90 · County 013, Massachusetts · Built 1957 · 2 Lanes · 517 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W350174KCDOTNBI
Year Built
1957
Reconstructed
1995
Length
57.2 m (187.7 ft)
Max Span
18 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
517
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,429,000
Total Project Cost
$6,644,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.