I 495 NB over HWY COMMONWEALTH DR

.4 MI N MERRIMAC RIVER · County 009, Massachusetts · Built 1962 · 4 Lanes · 62,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L040402X9DOTNBI
Year Built
1962
Length
31.4 m (103 ft)
Max Span
14.3 m
Width
20.1 m (65.9 ft)
Lanes
4
Daily Traffic
62,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,176,000
Total Project Cost
$6,265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.