I 495 NB over HWY RAMPS A & B

.3 MI N MERRIMAC RIVER · County 009, Massachusetts · Built 1962 · 3 Lanes · 57,480 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L040392X7DOTNBI
Year Built
1962
Reconstructed
2002
Length
45.4 m (149 ft)
Max Span
25.9 m
Width
21.5 m (70.5 ft)
Lanes
3
Daily Traffic
57,480
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,430,000
Total Project Cost
$11,146,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.