I 495 UPPER LEVEL over I 495 LOWER LEVEL

AT MERRIMAC RIVER · County 009, Massachusetts · Built 1962 · 6 Lanes · 73,359 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
L040352XDDOTNBI
Year Built
1962
Reconstructed
2006
Length
319.7 m (1048.9 ft)
Max Span
42.7 m
Width
28.4 m (93.2 ft)
Lanes
6
Daily Traffic
73,359
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$59,000,000
Total Project Cost
$88,501,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.